欧色丰满女同hdI日本两性视频I欧美我不卡I欧美精品国产精品I亚洲激情成人I后入内射无码人妻一区I美女黄视频网站I精品国产自在精品国产I另类激情综合I都市激情久久I中出视频在线观看I福利视频二区I黄色大片免费在线观看I伊人黄I少妇资源I成人精品免费视频I成人免费一级片I5a毛片I久久精品夜夜夜夜夜久久I国产精品免费在线观看视频I亚洲福利视频网站I狠狠操亚洲I国产在线偷I亚洲a色I久久这里只有精品首页

Welcome to Changxing Baodi Environmental Protection Technology Co., Ltd!

中文版 | English
 
Your current position: Home >> Atomic ash construction steps

Atomic ash construction steps


 Atomic ash construction is a key process in fields such as automotive repair and industrial manufacturing. Its standard process can be divided into four steps. Below, the editor of Changxing Baodi Environmental Protection Technology Co., Ltd., a manufacturer of atomic ash, summarizes the specific operational points as follows:

1、 Preparation before construction
Substrate processing
Remove surface oil stains, rust, and dust, use sandpaper to increase roughness, and ensure that the atomic ash adheres firmly.
2、 Atomic ash blending
Proportional mixing
Mix the main ash and curing agent in a ratio of 100:2~3 (100:2 in summer and 100:3 in winter), refer to the product instructions for specific proportions.
Stir evenly until there are no bubbles. It is recommended to operate on a mixing plate to improve efficiency.
2、 Atomic ash blending
Proportional mixing
Mix the main ash and curing agent in a ratio of 100:2~3 (100:2 in summer and 100:3 in winter), refer to the product instructions for specific proportions.
Stir evenly until there are no bubbles. It is recommended to operate on a mixing plate to improve efficiency.
3、 Scratch coating construction
Layered scraping technique
First layer (thin scraping): The scraper is at an angle of 60 ° or more with the workpiece, and the concave area is filled with force, with a thickness controlled between 2-3mm.
Second layer (filling): Tilt the scraper at a 45 ° angle, overlap horizontally or vertically by 1/3-1/2, and apply to cover the entire depressed area.
Third layer (finishing): The scraper is parallel to the surface, leveled, and reserved for polishing.
Precautions
Avoid excessive scraping and coating in a single step. It is necessary to dry the layers and then touch up.
The environmental temperature affects the curing speed, and high temperature can shorten the drying time.
4、 Drying and polishing
Accelerated drying
Use an infrared baking lamp (70cm away) to bake for about 5 minutes, dry thoroughly, and then polish.
Polishing process
Using dry grinding (avoiding water grinding), gradually refine with P-80 to P-240 sandpaper in sequence.
Maintain even force during manual polishing to ensure a smooth surface.
By following the above steps, the construction quality of atomic ash can be ensured, which is suitable for scenarios such as sheet metal repair and industrial filling. In practical operation, the process needs to be adjusted according to the characteristics of the substrate and product.


PrevHow to make atomic ash scraping smoother?
NextHow to choose a suitable atomic ash manufacturer?

Copyright © 2020 Changxing Baodi Environmental Protection Technology Co., Ltd all reserved Web Admin --> >>

浙公網安備 33052202000243號?浙ICP備17019658號

主站蜘蛛池模板: 庄浪县| 孟连| 白朗县| 高青县| 吉木乃县| 交口县| 白河县| 许昌县| 汾阳市| 石阡县| 疏附县| 澄江县| 长丰县| 托里县| 商南县| 潍坊市| 琼结县| 巴里| 中卫市| 阜阳市| 乌苏市| 高唐县| 三台县| 永寿县| 剑川县| 成都市| 旺苍县| 镇雄县| 三门县| 墨玉县| 河源市| 原平市| 巴塘县| 呼和浩特市| 永昌县| 临洮县| 灵川县| 南丰县| 新龙县| 武汉市| 和龙市|