欧色丰满女同hdI日本两性视频I欧美我不卡I欧美精品国产精品I亚洲激情成人I后入内射无码人妻一区I美女黄视频网站I精品国产自在精品国产I另类激情综合I都市激情久久I中出视频在线观看I福利视频二区I黄色大片免费在线观看I伊人黄I少妇资源I成人精品免费视频I成人免费一级片I5a毛片I久久精品夜夜夜夜夜久久I国产精品免费在线观看视频I亚洲福利视频网站I狠狠操亚洲I国产在线偷I亚洲a色I久久这里只有精品首页

Welcome to Changxing Baodi Environmental Protection Technology Co., Ltd!

中文版 | English
 
Your current position: Home >> s the solidification of atomic ash too fast? Changxing Baodi provides you with tips!

s the solidification of atomic ash too fast? Changxing Baodi provides you with tips!


 Atomic ash (also known as unsaturated polyester putty) is an indispensable surface filling and repair material in daily industrial fields such as automobile maintenance, furniture manufacturing, and ship repair. It is widely recognized by users for its excellent filling, polishing, adhesion, and rapid curing properties. Changxing Baodi Environmental Protection Technology Co., Ltd., as a professional manufacturer of atomic ash, has always been committed to providing customers with high-quality products and practical solutions. 

Atomic ash is mainly composed of unsaturated polyester resin, fillers (such as talc powder), a small amount of additives, and supporting curing agents. Its core advantages lie in:
1. Strong filling ability: It can effectively fill defects such as dents, sand holes, and welds on substrates such as metal and wood.
2. Fast drying speed: When used in conjunction with a curing agent, it can harden in a short period of time, significantly improving work efficiency.
3. Good polishing performance: After curing, the hardness is moderate and easy to polish flat, providing a good foundation for subsequent spraying.
4. Excellent adhesion: It has good adhesion to substrates such as metal and wood that have been properly treated.
5. High stability: High quality atomic ash has low shrinkage rate and is not easy to crack or fall off.
Today, Changxing Baodi Environmental Protection Technology Co., Ltd., a manufacturer of atomic ash, received a call from a user asking: What should I do if the atomic ash dries too quickly? Let me explain briefly below
The rapid drying of atomic ash can be solved by adjusting the mixing method, controlling the proportion of curing agent, and optimizing the construction environment. The main reasons include excessive curing agent, high ambient temperature, or excessive mixing amount. Targeted measures such as small and multiple mixing, appropriate reduction of curing agent addition ratio (not exceeding the lower limit), and lowering construction temperature need to be taken. ‌‌‌‌
Adjust the allocation method and proportion
Small amount and multiple blending: calculate the single dosage according to the gel time of the putty, so as to avoid too much one-time blending that will lead to curing before use up. It is recommended to control the amount of each blending within 5-10 minutes. ‌‌‌‌
Reasonably control the proportion of curing agent:
Within the recommended curing agent ratio range by the manufacturer (usually 1.5% -3%), reduce the amount added appropriately to slow down the drying speed, but ensure that it is not lower than the minimum ratio requirement to avoid not drying. ‌‌
Attention: Excessive curing agent is one of the main reasons for rapid drying, and it is necessary to strictly follow the instructions for proportioning.
Optimize the construction environment
Temperature control: High temperature will accelerate the solidification of atomic ash. It is recommended to carry out construction in an environment of 15-25 ℃, avoiding direct sunlight or using heating equipment. ‌‌‌‌
Thin scraping treatment: Adopting a layered thin scraping method, with each layer thickness not exceeding 3mm, shortening the single construction time and reducing the risk of rapid local curing. ‌‌
Other auxiliary measures
Choose slow drying products: If the conventional atomic ash drying speed is too fast, it can be replaced with slow drying models or customized products. ‌‌
Pre treatment of board: Ensure that the construction surface is free of oil and water stains, and avoid accelerated drying caused by abnormal reaction between atomic ash and substrate due to pollution.
The atomic ash produced by Changxing Baodi Environmental Protection Technology Co., Ltd. strictly controls the quality of raw materials and production processes to ensure stable and reliable product performance. We understand that every detail in construction is related to the final outcome. If you encounter the problem of rapid solidification of atomic ash, please do not worry and refer to the above suggestions for adjustment. If the problem persists or you have any questions about product selection, please feel free to contact Changxing Baodi's technical service team at any time. We will wholeheartedly provide you with professional technical support and solutions.
Choose Changxing Baodi Atomic Ash for an efficient and reliable surface repair experience!
Kind reminder: Please refer to the product manual of Changxing Baodi Atomic Ash that you are using for specific operations. Please wear protective equipment during construction to ensure safe operation.


PrevOverview of usage guidelines and precautions for atomic ash
NextAnalysis of Atomic Ash Shaping Technology

Copyright © 2020 Changxing Baodi Environmental Protection Technology Co., Ltd all reserved Web Admin --> >>

浙公網(wǎng)安備 33052202000243號?浙ICP備17019658號

主站蜘蛛池模板: 溧阳市| 介休市| 墨竹工卡县| 化德县| 新巴尔虎右旗| 泰安市| 唐海县| 海宁市| 桦南县| 那坡县| 姜堰市| 怀柔区| 隆昌县| 武乡县| 汉阴县| 如东县| 德庆县| 堆龙德庆县| 屯门区| 丘北县| 肥西县| 晋江市| 新宁县| 若尔盖县| 永年县| 格尔木市| 文化| 桃园市| 嘉禾县| 丰镇市| 旬阳县| 桐乡市| 隆昌县| 宜城市| 云南省| 同心县| 安岳县| 封丘县| 陆川县| 华安县| 石林|