Sound-absorbing and Sound Insulation Coating Paint
Published by:2026-2-8 Categories: Fire Retardant Coatin Viewed by: 95 times
Sound-absorbing and sound-insulating coating Construction ratio: generally, it is not necessary to dilute. If it is necessary, please add clear water to dilute it, which shall not exceed 10% of the total weight of the paint (paint: water = 1: 0 ~ 0.1 weight ratio).
Construction method: spraying. At least 3 mm thick. Manual spraying: (use ordinary real stone paint spray gun. The construction method is spraying like real stone paint). General construction area: A worker can do 150 to 200 square meters per day, depending on the thickness. If the thickness is 0.5 cm and the coating dosage is 1 square meter /5 kg, it can be sprayed for molding at one time; If the thickness is 1 cm and the coating dosage is 1 square meter /10 kg, it can be sprayed twice for molding If the thickness is 1.5 cm and the coating dosage is 1 square meter /1.5 kg, it can be sprayed for molding three times; Coating area: 1m2/1kg/0.1cm; Different thicknesses require different quantities Drying time: the surface drying time is more than 300 minutes /30 degrees Celsius, and the dry time is more than 72 hours /30 degrees Celsius. 1.Construction temperature: ≥5 degrees Celsius Storage: Store in a cool, ventilated and dry place at 5-25℃. Guard against frost. At the same time, it meets the national thermal insulation standard GB/T 10294-2008 (Determination of steady-state thermal resistance and related characteristics of thermal insulation materials), and the thermal conductivity is 0.063wd(m.k) 2: Plane sound-absorbing paint (sound-absorbing latex paint)
Type: sound-absorbing materials and acrylic copolymer compounds, selected high-quality additives and pigments and fillers at home and abroad. Construction ratio: paint: water = 1: 0.1 ~ 0.2 (weight ratio). Construction methods: brush coating, roll coating and spray coating Painting area: 8 square/kg (single pass) (dry film thickness greater than 30 microns) Drying time: 120 minutes /30℃, 24 hours /30℃. Gloss: 0-20 degrees; Color: please refer to and select the color number "Combelli Paint Building General Color Card"; Scrubbing. resistance times: more than 8000 times
Construction temperature; ≥5 degrees Celsius. Construction technology: scraping putty paste twice-primer-1-2 times-sound-absorbing paint topcoat twice. Storage: Store in a cool, ventilated and dry place at 5-25℃. Guard against frost. 3: sound-absorbing coatings Type: Sound-absorbing materials and acrylic copolymer compounds, selected high-quality additives and pigments and fillers at home and abroad. Construction ratio: generally do not dilute, if you need to dilute, please add clear water to dilute, not more than 10% of the total weight of the paint (paint; Water =1:0~0.1 weight ratio). Construction method: spraying. (with ordinary real stone paint spray gun. The construction method is sprayed like real stone paint) Painting area: 1m2 kg (single pass) (Dry film thickness is about 1 mm), usually 1-2 mm thick Drying time: 300 minutes for surface drying /30℃, 72 hours for practical drying/above 30℃. (see the thickness, under the condition of general ventilation). Gloss: 0-20 degrees; Color: please refer to and select the color number "Combelli Paint Building General Color Card" Construction temperature: ≥5℃. Construction technology: scrape putty twice-sound-absorbing paint top coat 1-2 times. (Flexible construction according to different places. Storage: Store in a cool, ventilated and dry place at 5-25℃. Guard against frost. 4: plant fiber sound-absorbing paint Type: sound-absorbing powder nano material, plant fiber, silicone-acrylic emulsion and other copolymerization compounds. Construction ratio: generally do not dilute, if you need to dilute, please add clear water to dilute, not more than 10% of the total weight of the paint (paint; Water =1:0-0.1 weight ratio) Construction method: spraying. With ordinary tools. (with ordinary real stone paint spray gun. The construction method is sprayed like real stone paint) Painting area: 1 square kilogram millimeter thick (single pass) (Dry film thickness is equal to Q1 cm), and the thickness should be at least 3 mm. Color: The general material is dark. Please refer to and select the color number "Combelli Paint Building General Color Card"; Dry touch: < 5 hours/25℃; Work hard for 72 hours/above 25℃. Construction temperature: ≥5℃ Construction technology: scrape putty twice, spray sound-absorbing paint topcoat 1-2 times or more. (Different thickness, flexible construction) Storage: Store in a cool, ventilated and dry place at 5-25℃. Guard against frost. 5: sound insulation coatings Type: sound-insulating nano-materials, sound-absorbing materials and pure acrylic emulsion. Construction method: scraping and coating Construction temperature: ≥5℃; Construction technology: dry cement wall surface-scraping ordinary putty twice and special medium paint for sound insulation coating (If it is 5 mm thick, it is best to scrape it twice. If it is 3 mm thick, it is enough to scrape it once. ) (construction methods are different in different places, which is for reference only). Painting area: 1m2/1kg (one pass) (dry film thickness is equal to 1mm Finger dry: < 5 hours /25℃:1 mm thick, 36 hours/above 25℃ Gloss: 0-20 degrees; Color: please refer to and select the color number "Combelli Paint Building General Color Card" complete Storage: Store in a cool, ventilated and dry place at 5-25. Guard against frost. Advice:
1. Pay attention to safety when moving, and keep it out of reach of children after opening it. 2. Please use skilled workers during the construction, pay attention to safety protection, and wash them with clear water immediately if you accidentally see them. Or see a doctor right away 3. Inability to eat. It is recommended to wear masks and gloves during construction 4, aerial work must wear a seat belt, do all kinds of safety measures, in strict accordance with the site management regulations. 5. Please use it within the warranty period. Open the lid and use it as soon as possible. 6. The wall shall be solid, waterproof, dry, smooth and clean. If it has been eroded by mold, it should be cleaned first and the pollutants eroded by mold should be removed 7. Do not add too much water during thinning construction with clear water to avoid construction sagging, dry film powder removal and covering Poor force and other defects. 8. Please wash and dry the tools immediately after use, 9. general interval construction coating time to 6~12 hours/above 25℃, depending on the specific construction environment and to Stop construction when the temperature is lower than 5 degrees;
10. If spraying on smooth objects or other plates, it is recommended to spray one layer of special transparent seal first.
It depends on the thickness.Primer, after the primer is completely dried (24 hours /25℃), spray sound-absorbing and sound-insulating paint topcoat Implement relevant national standards Sound absorption; GB/T16731-1997 code for measurement of sound absorption coefficient by chamber method GBJ47-1983 classification of sound absorption performance of building sound absorption products GB/T20247-2006 sound absorption measurement of acoustic reverberation room Sound insulation: GB/T75-1984 Code for Measurement of Building Sound Insulation Interior wall: GB/T9756-2018 Synthetic Resin Emulsion Interior Wall Coatings GB/185822001 limit of harmful substances in interior wall coatings of interior decoration materials GB/T9755-2014 Synthetic Resin Emulsion Exterior Wall Coatings GB/T149072002 fire retardant coatings for steel structures Strictly implement ISO9001:2000 international certification standard and lSO354:2003 Storage of all products: Be sure to store it in a cool, ventilated and dry place at 5-25℃. Guard against frost. Under this condition, the shelf life is 6 months. Prev:Anti Fire Paint |
|
About us |
Product Categories | Contact way Address:No. 268, Hongchang Road, Hongqiao Town, Huzhou, Zhejiang, ChinaZhejiang Province |
| Copyright © 2020 Changxing Baodi Environmental Protection Technology Co., Ltd all reserved | Web Admin --> >> |